DNU – TEXAS SOP LESSON 3 ASSIGNMENT

  1. Match the Action at the top with the corresponding inspection SOP task at the bottom.

    Sort elements
    • Heating System
    • Cooling Systems
    • Not Required
    • Ventilation
    • Evaporative Coolers
    • Report the type of systems; and the energy sources
      • Report the type of systems
        • Report deficiencies in damaged systems or improper material
          • Operate heat pumps, in the heat pump mode, when the outdoor temperature is above 70 degrees
            • Report type of system and water supply line